Project Reference
Network & Video Surveillance System
Network & Video Surveillance System
Client : Nippon Steel Sumikin Chemical Materials Indonesia, Cikarang. (Project Under PT. Cakra Security & PT. Tricode Inovasi Teknologi)

• Install CCTV Manufacture & Office.

• Wiring Cabling with Conduit High Impact & Galvanized.

• Installation 30 Units IP Camera ACTi.

• Installation 2 units Cabinet contains 4 unit Switch with UPS.

• Supply & Install Panel Cabinet LVMDP 230VAC.

• Wiring cable power.

• Installation 1 Units NVR (Network Video Recorder ACTi).

• Configure Video Surveilance System (CCTV).

• Dismantle Existing Camera & NVR.

• Routine Maintenance.

• Conduct training for User/ Operator.