Project Reference
Project Supply, Wiring, Termination & Install Perimeter Alarm System
Project Supply, Wiring, Termination & Install Perimeter Alarm System
Client : PT. YASULOR INDONESIA (L’OREAL)

• Supply & Install photo beam sensor 48 pcs

• Supply & Install Gallagher Controller 6000

• Supply & install Gallagher 4H module

• Supply & install Gallagher HBus 8 in 4 out

• Supply & install Gallagher T20 Multi Tech Terminal

• Supply & Install Server for Gallagher Command Centre

• Supply & Install Siren, strobe and panic button

• Supply & install HDPE

• Supply & install cable

• Supply & install pole galvanized

• Configuration server and pc workstation

• Conduct training to end user